Year |
Description |
Project |
Value |
Client |
2010 |
Concrete block mattress construction |
SP12 |
16 Matts |
IOEC |
Pipeline Freespan correction |
SP15,16 |
72 Bags |
IOEC / RAL Offshore |
Shoreline Protection Geo bag |
Siri – Assaloyeh |
782 Geo Bags |
IOEC / RAL Offshore |
2011 |
Cable Crossing Concrete Block Mattress |
SP15,16 |
36 Matts |
IOEC / SGK |
Cable Crossing Concrete Block Mattress |
SP17,18 |
36 Matts |
IOEC / SGK |
Pipeline Freespan correction |
SP12 |
29 Bags |
IOEC / SGK |
Cable Crossing Concrete Block Mattress |
FOROOZAN |
30 Matts |
IOEC / SGK |
2012 |
Pipeline Freespan correction |
SP15,16 |
140 Bags |
IOEC / SGK |
Geo Sand Bag |
SP15,16 |
185 Geo Bags |
IOEC |
Geo Sand Bag |
FOROOZAN |
215 Geo Bags |
IOEC |
Pipeline Freespan correction |
SP17 |
117 Bags |
IOEC / SGK |
Pipeline Freespan correction |
FOROOZAN |
87 Bags |
IOEC / SGK |
Cable Crossing Concrete Block Mattress |
SP19 |
20 Matts |
IOEC |
Cable Crossing Concrete Block Mattress |
SP20,21 |
20 Matts |
IOEC |
Cable Crossing Concrete Block Mattress |
SP14 |
20 Matts |
IOEC |
Pipeline Freespan correction |
SP18 |
112 Bags |
IOEC / SGK |
Pipeline Freespan correction (In Trench) |
SP16 |
22 Bags |
IOEC / RAL Offshore |
Geo Sand Bag |
Bahregansar |
97 Geo Bags |
SADAF |
2013 |
Cable Crossing Concrete Block Mattress |
SP13 |
10 Matts |
SADRA / DOT |
Cable Crossing Concrete Block Mattress |
SP22,24 |
18 Matts |
SADRA / DOT |
Pipeline Freespan correction |
RESHADAT |
107 Bags |
TASDID / AKAM |
2014 |
Spool Protection Concrete Block Mattress |
FOROOZAN |
7 Matts |
Petroiran / Synergy Co. |
Spool Freespan correction |
FOROOZAN |
22 Bags |
Petroiran / Synergy Co. |
J-Tube support & Cable Protection Grout Blanket |
SPIFON II Cable |
2 Jtubes |
E-Marine / Synergy Co. |
2015 |
Spool Freespan correction |
SP19 |
8 Matts |
IOEC / RAL Offshore |
Pipeline Freespan correction |
SP20,21 |
24 Matts |
IOEC / SGK |
2017 |
Cable Crossing Concrete Block Mattress |
SP14 |
22 Matts |
IOEC |
Spool Protection Concrete Block Mattress |
SP19 |
20 Matts |
IOEC |
Jacket Pile Grouting (SPD14A & SPD14C) |
SP14 |
2*3 Legs |
ISOICO / Noandishan Lian |
2018 |
Jacket Pile Grouting (SPD13A ) |
SP13 A |
3 Legs |
SADRA / DOT |
Jacket Pile Grouting (SPD23A ) |
SP23 A |
3 Legs |
SADRA / DOT |
Jacket Pile Grouting (SPD24A ) |
SP24 A |
3 Legs |
SADRA / DOT |
Spool Protection Concrete Block Mattress |
SP14 |
107 Matts |
IOEC / RAL Offshore |
Pipeline Freespan correction |
SP13B |
56 Bags |
IOEC /DSOI |
Pipeline Freespan correction |
SP14 |
56 Bags |
IOEC / RAL Offshore |
Cable Crossing Concrete Block Mattress |
SP19 |
4 Matts |
IOEC |
Cable Crossing Concrete Block Mattress |
SP22&24 |
4 Matts |
SADRA / DOT |
Jacket Pile Grouting (SPD24B) |
SP24 B |
3 Legs |
SADRA / DOT |
Jacket Pile Grouting (SPD14B ) |
SP14 B |
3 Legs |
ISOICO / Noandishan Lian |
2019 |
Jacket Pile Grouting (SPD14D ) |
SP14 D |
3 Legs |
ISOICO / Noandishan Lian |
Spool Freespan correction |
SP14 |
46 Bags |
IOEC / RAL Offshore |
Spool Protection Concrete Block Mattress |
SP13 |
24 Matts |
IOEC |
Spool Protection Concrete Block Mattress |
SP14 B/D |
79 Matts |
IOEC/RAL Offshore |
Spool Protection Concrete Block Mattress |
SP23 |
9 Matts |
IOEC |
Jacket Pile Grouting (SPD13A ) |
SP13 A |
3 Legs |
SADRA / DOT |
Cable Crossing Concrete Block Mattress |
SP16 |
22 Matts |
IOEC |
2020 |
Cable Protection Concrete Block Mattress |
Forozan |
40 Matts |
SAIRAN |
Cable Crossing Concrete Block Mattress |
Kish-Gorze |
5 Matts |
IOEC |
2022 |
Pipeline Freespan correction |
Khark |
12 Bags |
IOTC /RAL Offshore |
Pipeline Freespan correction |
Abozar |
122 Bags |
IOEC |
Spool Protection Concrete Block Mattress |
Abozar |
107 Matts |
IOEC |
Pipeline Stabilization Grout Bags |
SP14 |
26 Bags |
IOEC |
2023 |
Pipeline Freespan correction |
SP11 |
4 Bags |
IOEC |
Spool Protection Concrete Block Mattress |
SP11 |
27 Matts |
IOEC |
Pipeline Freespan correction (ongoing) |
SP16 |
160 Bags |
IOEC |
Spool Freespan correction (ongoing) |
Abozar |
20 Bags |
IOEC |